North Hall Restrooms Renovated!

The restrooms on floors one through four have been renovated and now are wheelchair accessible. New lighting, wall tile, toilet partitions, sinks, faucets, audible/visual alarms, sharps disposal containers, and plumbing fixtures were included.

Restroom photo

Additional Hearing Loops Installed!
 
Hearing Loop Logo

Hearing loop systems have been installed  in two conference rooms and a training lab at the State Hygienic Laboratory facility. http://maps.uiowa.edu/amenity/hearing-loop-system

UI Campus Enhanced Way-finding App!

Facilities Management has been working with an application developer in Finland to support individuals who are blind or sight impaired with finding their way around campus. Visit this link for a video that demonstrates the project. https://www.youtube.com/watch?v=aGFotnjKstA

Person who is blind navigating campus sidewalk

Theatre Building Main Entrance

The main entrance to the Theatre Building has been completely reconstructed. The elevated patio has been removed and all people can now access the building entrance using the same path. This project also mitigated building water infiltration issues.

Before

Before Photo

After

After Photo

Main Library North Entrance

The power door button at the north entrance to the main library has been relocated to a more visible and usable location.

Before

Before Photo

After

After photo

Campus Recreation & Wellness Center Building Entrance Improvement

A contrasting yellow striping has been added to the stair nosing of the steps located at the southeast entrance of the Campus Recreation & Wellness Center in order to enhance visibility and safety when navigating the stairs during the evening hours.

Photo of entrance stairs with contrasting yellow striping.

Hardin Library for Health Sciences Receives Elevator Upgrades

The elevator at Hardin Library for Health Sciences has been modernized and upgraded for accessibility. Accessibility upgrades included raised call buttons, visible and audible hall signals, verbal annunciation, accessible car control floor designation buttons, and emergency two-way communication system with tactile symbols and characters.

Photo of Hardin Library Elevator

English Philosophy Building New Curb Cut

A curb ramp has been installed at the southeast corner of the English Philosophy Building. This curb ramp allows for an additional accessible pedestrian route at this location.

Before

Photo of EPB without curb cut

After

Photo of EPB with curb cut

Pentacrest Sidewalk Stairs Removed

The steps located at the northeast corner of Schaeffer Hall on the Pentacrest have been removed. There is an identical set of steps at the southeast corner of MacBride Hall that is in the process of being removed. 

Before

pentacrest

After

pentacrest

English Philosophy Building Signage

Room signage in the English Philosophy Building has been recently updated and replaced with new accessible signage that includes tactile characters and Braille. 

Before

Room number sign without braille

After

Room number sign with braille

Becker Communication Studies Building Restroom Renovation

All of the restrooms in the Becker Communication Studies Building have been renovated. Renovations included reconfiguring the previous restroom layouts to allow for wheelchair access. New toilet partitions, countertops, plumbing fixtures, faucets, sharps containers, hand dryers, and additional restroom accessories have been installed.  

becker communication studies building restroom renovated and accessible

IMU Temporary Ramp Installed

A temporary ramp has been installed that allows for an accessible pedestrian route to and from the IMU footbridge to be maintained while construction in the area continues over the next year.


temporary ramp to bridge over river next to IMU

LGBT-Resource Center Now has an Accessible Bathroom

The Lesbian Gay Bisexual & Transgender Resource Center now has an accessible bathroom on the main floor. Before, there was a "janitor style" toilet located at the top of the basement entry stairway within a closet. 

Before

After

  

LGBT-RC New Accessible Pedestrian Route

The Lesbian Gay Bisexual & Transgender Resource Center now has an accessible pedestrian route available to access the facility.  A short section of concrete sidewalk was installed to connect the driveway with the walkway on the north side of the Gerdin Athletic Learning Center. Accessible parking is located nearby to the west. An accessible restroom was installed earlier in the year.

pathway to LGBT resource center now accessible

Medical Research Center - Elevator Upgrade

Facilities Management recently completed an elevator upgrade at the Medical Research Center. Accessibility upgrades included raised call buttons, visible and audible hall signals, verbal annunciation, accessible car control floor designation buttons, and emergency two-way communication system with tactile symbols and characters.

Bowen Science Building South Entrance Plaza - New Ramp

A concrete ramp has been installed at the Bowen Science Building south entrance plaza. Individuals using wheeled mobility devices now have available to them a route which connects the east and west campus via the Bowen Science Building and this ramp. 

MERF - Hearing Loop Installed in Room 1110A

The College of Medicine recently installed a hearing loop system in the Medical Education Research Facility room 1110A (Prem Sahai Auditorium). A hearing loop system consists of a copper wire installed in the ceiling or floor of a room, and that wire sends audio – like that from a professor wearing a microphone – directly to a hearing aid or cochlear implant in the room. 

Quad Ravine - Accessible Route Installed

Facilities Management is nearing completion of a repair and improvement project at the Quad Ravine.  These improvements now offer a pedestrian route without stairs connecting the East Campus to the Health Sciences/UIHC Campus. Several stretches of sidewalk have been realigned and replaced. Select stairs have been replaced and handrails added. A section of stairs which connected the Quad Ravine to the plaza on the southeast side of the Bowen Science Building have been eliminated and replaced with an ADA compliant ramp. An additional ramp was constructed at the Bowen Science Building plaza entrance doors that allows for wheelchair access into the building at this access point. Upon entering the building, one can navigate to other buildings and sites on campus by means of the building elevators and tunnel system. 

Before

path on quad ravine inaccessible with stairs

After

quad ravine pathway now accessible. stairway removed and slope installed

MacLean Hall Restroom Renovation

Facilities Management recently completed the renovation of all four restrooms in MacLean Hall. All four restrooms are now completely accessible. A partial list of the improvements include new wheelchair accessible toilet compartment stalls, accessible lavatories and faucets, lowered mirror heights, and accessible toilet fixtures. Adequate turning space along with appropriate approach and maneuvering clearances was an integral part of the design.  Floor, wall, and ceiling finishes were also upgraded in several of the rooms.

Before

Maclean Hall bathroom not wheelchair accessible


After
maclean hall bathroom after photo with accessible stalls

North Hall Elevator Upgrade

The elevator in North Hall has been modernized and upgraded for accessibility. Accessibility upgrades included raised call buttons, visible and audible hall signals, verbal annunciation, accessible car control floor designation buttons, and emergency two-way communication system with tactile symbols and characters.

Calvin Hall Elevator Upgrade

The elevator in Calvin Hall has been modernized and upgraded for accessibility. Accessibility upgrades included raised call buttons, visible and audible hall signals, verbal annunciation, accessible car control floor designation buttons, and emergency two-way communication system with tactile symbols and characters.

Before

After

Schaeffer Hall Exterior Pathway Changed to be Accessible

The exterior steps located at the southeast corner of Schaeffer Hall have been eliminated and replaced with a sloped sidewalk.

Before 



After

Riverside Recital Hall Upgrade

Various accessibility upgrades were accomplished late last fall at the Riverside Recital Hall site. Pedestrian access from the parking lots was enhanced to improve safety and allow for a stable walking surface.  Sidewalks were extended and added in order to alleviate the need for pedestrians to walk in the street and drives to access the building entrances. Additional accessible parking stalls were added. Exterior lighting levels were increased to enhance visibility and safety.

Before

After

Iowa Advanced Technology Laboratory Upgrades - 1st Floor

The Men’s and Women’s restrooms located on 1st floor have been reconfigured to allow for wheelchair accessibility. This project also included a new accessible unisex shower room.

Linquist Center - South 2nd Floor Restrooms Upgrade

The Men’s and Women’s restrooms located on 2nd floor of Lindquist Center south have recently been renovated. Both restrooms are now completely accessible. Improvements included new wheelchair accessible toilet compartment stalls, accessible lavatories and faucets, lowered mirror heights, appropriate approach and maneuvering clearances along with adequate turning space. Floor and wall coverings were also upgraded.

restrooms in LC south on 2nd floor have been renovated and now accessible

Biology Men's Restoom on 1st Floor - Now Accessible

The Men’s restroom located on 1st floor of the Biology Building has been renovated and is now wheelchair accessible. The 1st floor drinking fountain was replaced with a dual height accessible fountain. The Women’s restroom was altered during previous years to improve accessibility.

Biology mens restroom now accessible

Medical Laboratories - Hearing Loop Installed

The UI’s first permanent hearing loop installation was recently accomplished in an 84-seat classroom located at ML. This photo was taken while faculty, staff, and Contractors tested the newly installed system. More info: http://www.kcrg.com/news/local/Hearing-Loop-a-Big-Help-at-UI-205860921.html 

hearing loop installed in classroom
  

hearing loop notification sign

Chemistry Building – 2nd floor Unisex Restroom

As part of a project to address accessibility and life-safety deficiencies in the Chemistry Building, nine stair enclosures and fifteen restrooms have been modified to improve accessibility. The stair enclosures included modifications to doors, handrails and guardrails. Alterations to the restrooms included the entrances, accessible fixtures, wheelchair accessible toilet stalls and other modifications to improve accessibility within the rooms. Drinking fountains have been upgraded from a single fountain to dual height fountains. 

USB Accessible Crosswalk Installed

UI Parking & Transportation installed an accessible crosswalk with nearby accessible parking at the University Services Building. 

Before

USB inaccessible crosswalk with no curb cuts


After
USB accessible crosswalk installed with curb cuts

Dey House - Glenn Schaeffer Library Entrance

A power door operator was installed at the Dey House – Glenn Schaeffer Library

new power door installed at Dey House library entrance

Bowen Science Building - West Entrance

The Bowen Science Building wheelchair ramp located at the West entrance has been completely redone. 

accessible entrance ramp installed

Bowen Science Building - Cane Detection Guardrail Installed

A cane detection guardrail was installed under the concrete stairs at Bowen Science Building to prevent injury of individuals with sight impairments.

Calvin Hall – Renovated West and South Entrances

The west entry of Calvin Hall is a primary public entry for the Registrar’s Service Center and the only accessible entry for the building.  Since this west entry is used for service and delivery access, the existing condition is confusing and un-inviting. The existing service access system is directly outside the door, with adjacent stairs that do not have handrails.  The accessible route from the south is narrow with a sloping sidewalk system. 

Improvements include a public accessible route that is distinguishable from the service/delivery route. Though the service route is adjacent to the public entry; the public entry is emphasized with a larger court area and accessed by a new curving slope sidewalk and ramp system from the south. Directional signage from the adjacent parking ramp and other sides of the building will be included.

The south entry monumental stair has been removed and replaced including new metal guards (rails) and handrails. The new stair has a deeper top landing. 

Theatre Building - Main Entrance Power Door Installed 

The Theatre Building main entrance received a power door operator that now allows individuals with disabilities to easier navigate in and out of the facility. 

Before

After


 

Calvin Hall – Renovated Restrooms

This project includes full renovation of the ground/basement, first, and second floor restrooms to be ADA compliant.  A Women's restroom will be added to the Ground Floor which will also include a Lactation room. 

Music West Interim Building - Accessible Main Entrance Installed

Music West Interim Building now has an accessible main entrance.

Before

After


 

VAN ALLEN HALL - Southeast Entrance Upgrades

The southeast entrance, lobby, and the restrooms serving the large lecture halls at Van Allen Hall were recently upgraded.

Upgrades included renovating the entrance for accessibility; including sidewalk access and the removal of steps at the south entrance doors.

Power door switch and pair of entry doors.

The restrooms were completely renovated with wheelchair accessible stalls, new wall and ceiling finishes, and new plumbing fixtures. The renovation also included the addition of a unisex restroom. Power door openers were installed on the restroom doors and the doors entering into the two large lecture halls.

Pair of lecture hall doors with power door opener.
Men's restroom door with power door opener and room signage.

New accessible room signage and drinking fountains were also installed.

Dual level drinking fountain.

College of Nursing Building - Restroom Upgrades

The College of Nursing recently completed a project to upgrade all of their restrooms and provide for wheelchair access. New flooring and wall coverings, toilet partitions, sinks, faucets, audible/visual alarms, sharps disposal containers, plumbing fixtures, and room signage were included. Some of the doors entering the restrooms even have a power door opener on them! Kudos to the folks at the College of Nursing.

Men's restroom door with power door opener and ADA room sign.